top of page

Wiring instructions for our 8 Module devices

List of Topics


IMPORTANT NOTE:

  • Always connect the primary power source to P1 Terminal

  • Only one Neutral connection is available.

Case 1: Single Phase & Single Neutral

In Single Phase and Single Neutral scenarios, Loop P1 & P2 and connect the Phase to the P1 terminal and connect Neutral to the N terminal.

Case 1: Single Phase & Single Neutral

Case 2: Double Phase (UPS Phase & EB Phase) & Single Neutral

Connect the UPS Phase to the P1 terminal. Connect the EB Phase to P2 terminal and connect Neutral to N terminal.

Case 2: Double Phase (UPS Phase & EB Phase) & Single Neutral

Case 3: Triple Phase (UPS Phase, EB Phase & AC Phase) & Single Neutral

Connect the UPS Phase to P1 terminal. Connect the AC Phase, i.e. Air Conditioner Phase to P2 terminal. Connect Neutral to the N terminal and then Insulate the EB Phase.

Case 3: Triple Phase (UPS Phase, EB Phase & AC Phase) & Single Neutral

Load Wiring

To connect loads, just follow the connections as shown in the image below or the instructions at the back of the device with Smart Switches.

Load wiring for 8 Modules

Video Guide on wiring our 8 module devices


bottom of page