Smart Switch Installation Guide for 2 Switch Module

Ready to upgrade your home with smart technology but unsure where to start? Don't worry; we've curated a comprehensive guide to ensure your installation of the 2S smart switch is smooth and hassle-free. Follow these detailed steps for a seamless and smarter living experience!


Installation Essentials:

Before you begin, gather these essential tools and materials:


  • Insulated screwdrivers (star or flat)

  • Insulated pliers

  • Voltage tester

  • Wire strippers

  • Multimeter (optional)

  • New smart switch

  • Insulation tape

  • Appropriate wires (based on load and requirements)


Ensure you have everything ready to proceed smoothly with the installation of your 2S smart switch.


Safety Tips for Smart Switch Installation:

  • Read the smart switch instruction manual thoroughly.

  • Turn off the main circuit breaker and double-check with a voltmeter.

  • Use insulated tools and wear protective gloves.

  • Clearly label all wires for easy identification.

  • Ensure your workspace is dry and organised.


These steps will help ensure a safe and successful installation of your smart switch.


Module Compatibility and Console Box Specifications:

When preparing to install the 2S smart switch, understanding its compatibility and console box requirements is crucial for a successful setup:


Module Name: 2S

Console Box Size:  78 mm x 78 mm (3" x 3")


Module Specifications:

  • Light Switch (L): 6A 

  • High-Load Switch (H): 16A


Installation and Wiring Guide:

  1. Turn off the power at the breaker box.

  2. Label the phase, neutral, earth, and other load wires in the wall console box.

  3. Study the terminal labels on the product's wiring sticker to ensure correct wire connections.

  4. Connect the wires to their designated terminals as indicated below:

    • Neutral (N): Powers the device.

    • Phase (P) UPS/EB: Primary power supply.

    • Light (L): Control for individual light.

    • High-Load (H): Manages high-wattage devices.

  5. Check the wiring setup video for your specific type at home. Ensure all connections are correct, secure, and free of loose strands.

  6. Use insulation tape to secure exposed terminals and wire joints.

  7. Use a prying tool to carefully remove the glass panel without touching the circuit board.

  8. Insert the enclosure into the 2-module metal console box and secure it using the provided screws (M3.5*30mm).

  9. Align the top glass with the enclosure and press it firmly to lock it in place, ensuring that all four corners are securely locked.

  10. Restore power and test the switch for proper functionality.


If you need any device installation support or assistance, please call or WhatsApp.


Wiring Setup Scenarios:

Type 1: Single Power Source (EB or UPS and Common Neutral)



  1. The phases for EB and UPS will remain separate.

  2. The neutral line will be common for both EB and UPS. 

  3. In the above scenario, the phase and neutral connections will be as follows:

    • The UPS or EB phase is connected to P, providing power to the device and two loads(L, and H).

    • The common neutral will be connected to N.


Type 2: Additional Customization for High Load Output Using External Relay (Common Neutral)



  1. The phases for EB and UPS will remain separate.

  2. The neutral line will be common for both EB and UPS. 

  3. In the above scenario, the phase and neutral connections will be as follows:

    • The UPS or EB phase is connected to P, providing power to the device and two loads(L, and H).

    • The common neutral will be connected to N.

  4. To externally control high loads through an existing power switch (e.g., from L, 6A), add a 40A relay for external supply control.

  5. In the above scenario, the connections for the relay will be as follows:

    • The phase for the relay is from L.

    • The relay IN is directly connected from the DB phase.

    • Then the relay OUT is connected to the AC load.

    • The common neutral (N) will be connected for both the relay and the AC load.


Note: Implement this solution only with accurate information from the official technical support team.